CASE STUDIES
50 +
YEARS OF COMBINED EXPERIENCE
Demonstrating extensive experience
in snubbing and well intervention.
100 %
COMMITMENT OF
SAFETY
Upholding the highest safety standards on every project.
STRATEGICALLY LOCATED
IN WESTERN CANADA
Serving Alberta and the surrounding
oil and gas regions.
STEALTH WELL CONTROL PROJECT HIGHLIGHTS
RELIABLE WELL CONTROL SOLUTIONS WITH SAFETY AND PRECISION
We pride ourselves on delivering tailored solutions for complex well operations across Western Canada. With decades of experience and a commitment to safety, we’ve successfully completed a wide range of projects, from well interventions to full abandonments, while maintaining the highest standards of operational excellence.

WHY CHOOSE STEALTH?
Our teams have a reputation for maintaining high standards of well control with zero incidents.

Every project is tailored to meet our clients' unique needs and goals.

.jpg)
BRINTNELL PROJECT - LAST YEAR
OBJECTIVE: Safe Removal and Replacement of
Downhole Packer
WELL INFORMATION: Deep-Well, High-Pressure Environment
Location: Northern, AB

Procedure:
-
Rigged up 3k 9" snubbing stack on top of 11" BOP, hang-off flange, and cross-over spools.
-
Pulled unit aside, removed hanger, installed collar, bolted up stack, and staged collars.
-
Used mud can to reach the 9-5/8 packer, securing the well while removing the old packer.
-
Installed a new packer and staged to bottom.
Challenges:
-
Managing heavy loads while maintaining operational safety and efficiency.
-
Minimizing risk during high-complexity staging and packer replacement.
Results:
-
Reduced overhead loads, enhancing safety and efficiency.
-
Achieved project goals on time and within budget.
HELIUM PROJECT
OBJECTIVE: Complex Snubbing and Tubing Operations with Secure Well Control
WELL INFORMATION: High-Pressure Ram-to-Ram Setup, Double-Crown Rigl
Location: Saskatchewan

Procedure:
-
Rigged up 3k 9" snubbing stack on top of 11" BOP, hang-off flange, and cross-over spools.
-
Pulled unit aside, removed hanger, installed collar, bolted up stack, and staged collars.
-
Used mud can to reach the 9-5/8 packer, securing the well while removing the old packer.
-
Installed a new packer and staged to bottom.
Challenges:
-
Managing heavy loads while maintaining operational safety and efficiency.
-
Minimizing risk during high-complexity staging and packer replacement.
Results:
-
Reduced overhead loads, enhancing safety and efficiency.
-
Achieved project goals on time and within budget.
Procedure:
-
Rigged up 5k 7" unit on top of 3k 11' BOP and spools with hand-off flange.
-
Staged out 11' hanger using hang-off flange; pulled unit aside, installed collar, and bolted up.
-
Pulled 3-1/2 tubing staging collars using mud can to the 9-5/8 packer.
-
Removed the old packer, installed the new packer, and staged to bottom.
Challenges:
-
Complex rigging requirements with high-precision staging and collar handling.
-
Overhead load management to reduce risk and ensure team safety.
Results:
-
Streamlined well completion with reduced injury risk.
-
Achieved timely, cost-effective results, completing the project safely and efficiently.

BRINTNELL PROJECT - PREVIOUS YEARS
OBJECTIVE: Efficient Well Intervention with
Snubbing Operations
WELL INFORMATION: High-Pressure, Multi-Stage Completion
Location: Northern, AB
HELIUM PROJECT
OBJECTIVE: Complex Snubbing and Tubing Operations with Secure Well Control
WELL INFORMATION: High-Pressure Ram-to-Ram Setup, Double-Crown Rigl
Location: Saskatchewan

Procedure:
-
Job scope varied from high-pressure ram-to-ram operations to complex multi-packer and sliding sleeve setups.
-
Performed snubbing of 9m tubing over the double crown using a crane for secure breakdown.
-
Safely managed the well, breaking down tubing and BHA, and laid out components for inspection.
Challenges:
-
Executed high-pressure operations requiring precise handling.
-
Complex snubbing over double crown with strict safety protocols.
Results:
-
Successful well control with zero safety incidents.
-
Efficient breakdown and secure completion of tasks, supporting client’s operational timelines.
BRINTNELL PROJECT - PREVIOUS YEARS
OBJECTIVE: Efficient Well Intervention with
Snubbing Operations
WELL INFORMATION: High-Pressure, Multi-Stage Completion
Location: Northern, AB

Procedure:
-
Rigged up 5k 7" unit on top of 3k 11' BOP and spools with hand-off flange.
-
Staged out 11' hanger using hang-off flange; pulled unit aside, installed collar, and bolted up.
-
Pulled 3-1/2 tubing staging collars using mud can to the 9-5/8 packer.
-
Removed the old packer, installed the new packer, and staged to bottom.
Challenges:
-
Complex rigging requirements with high-precision staging and collar handling.
-
Overhead load management to reduce risk and ensure team safety.
Results:
-
Streamlined well completion with reduced injury risk.
-
Achieved timely, cost-effective results, completing the project safely and efficiently.
HELIUM PROJECT
OBJECTIVE: Complex Snubbing and Tubing Operations with Secure Well Control
WELL INFORMATION: High-Pressure Ram-to-Ram Setup, Double-Crown Rigl
Location: SASKATCHEWAN

Procedure:
-
Job scope varied from high-pressure ram-to-ram operations to complex multi-packer and sliding sleeve setups.
-
Performed snubbing of 9m tubing over the double crown using a crane for secure breakdown.
-
Safely managed the well, breaking down tubing and BHA, and laid out components for inspection.
Challenges:
-
Executed high-pressure operations requiring precise handling.
-
Complex snubbing over double crown with strict safety protocols.
Results:
-
Successful well control with zero safety incidents.
-
Efficient breakdown and secure completion of tasks, supporting client’s operational timelines.